1/4" side plate is being applied.  This shows the swim step and transom door. 
gallerygrey.gif
RETURN TO GALLERY MENU PAGE
Welding the starboard bilge keel. The bilge keels are set on 1/2" hull plate inserts with massive support structure of girders and frames on the inside of the hull. The forward or leading edge of each bilge keel is 2" round bar, the same stock as the chine rod. If anything hits these bilge keels they aren't' going anywhere. The bilge keels are designed to support the boat when the tide is out.
Hull plate is 1/4" steel from sheer to the single chine. Bottom plate is 5/16" steel. There is also a 5/16" thick 12" wide cutwater at the bow. Together with the 3/4"  stem the cutwater provides a beefy 1 3/8" thick bow presentation.
The 35" 5-blade NIBRAL skew Kaplan propeller is set and now the propeller nozzle will be fit and welded.
In this photo the superstructure is being fitted. The caprail and the two hull side rub rail are also seen. The hull rub rails are both 4" stainless steel half pipes, they and the cap rail will be left unpainted.
Starboard side fitting nearly complete. Bulwark doors cut. Bow thruster tube welded in place. Stainless steel anchor roller guides installed.